Been following BAS for a while, I personally think they’ll run into a lot of technical issues with the modules being limited to 10 tonnes (which is in place due to the limited carrying capacity of ISRO rockets). I wouldn’t be surprised if the plan changes to where the first module becomes a standalone space lab that gets retired after a few missions at most. Followed by a station with larger modules down the line.
1 Comment
Been following BAS for a while, I personally think they’ll run into a lot of technical issues with the modules being limited to 10 tonnes (which is in place due to the limited carrying capacity of ISRO rockets). I wouldn’t be surprised if the plan changes to where the first module becomes a standalone space lab that gets retired after a few missions at most. Followed by a station with larger modules down the line.